Updates & Revisions
Here you will find important updates and revisions to the articles and plans published in ShopNotes magazine.

July 1995
Issue 22
- Drill Press Hold-Down
- Page 6: Figure 5, Detail a
- Drawing indicates that the kerf is is located 1" from the top of the fence, but it should be at 1/2".
- Box Joints: Router Table
- Page 13: Side View Detail
- The counterbore should be read, "5/8"-dia. counterbore, 3/8" deep."
- Page 13: Instructions for Pin
- The last sentence in this section is a note. The note says you need to make a different backing board for each of the different-size box joints; this is incorrect. You need to make different adjustable fences for each different-sized box joints.